| Tech REQ # | System/Account | Description | Requested by | Prior | Process | Submit Date | Required Date | Status |
| 13347 | 6899251 | Gas Feed System for Petrasso Group (Welding Shop) | mcduffee | L | vw | 12/17/07 | 12/21/07 | working Arsenault |
| 13469 | DNB | DNB cathode (Misc, Fitz, Mechanical Engineering) | granetz | L | d | 03/11/08 | 03/28/08 | pending |
| 13481 | COMP./PLC | autocad drawings for launcher PLC (Mechanical Group) | bosco | L | d | 03/19/08 | pending | |
| 13538 | INST/ELEC | Build Hammon Boxes and Put them on the Shelf in the Electronics Shop (Electronic Shop) | burke | L | e | 04/18/08 | 04/25/08 | pending |
| 13578 | DIAGNOSTICS | Repair probe boards (Electronic Shop) | labombard | L | e | 05/07/08 | 05/14/08 | working Dave B, Supv:Parkin |
| 13604 | VAC. SYS. | Vacuum bypasses (Vacuum, Electronic) | bosco | L | cpv | 05/22/08 | pending | |
| 13620 | COMP./PLC | Draw RSview SE network (Mechanical Group) | bosco | L | d | 06/03/08 | pending | |
| 13622 | IN VESSEL | Copper spot welding table (Machine Shop) | pierson | L | mp | 06/04/08 | 06/10/08 | working Anderson |
| 13623 | COMP./PLC | Camac crate locations (Electronic Shop) | bosco | L | cp | 06/04/08 | working Dave B., Supv:Parkin | |
| 13633 | IN VESSEL | In Vessel Lighting (Electronic Shop) | parkin | L | e | 06/06/08 | 06/13/08 | working , boards and parts are in, Parkin |
| 13637 | DIAGNOSTICS | Cut and straighten moly wires (Machine Shop) | labombard | L | m | 06/09/08 | 06/16/08 | working Gerolamo |
| 13638 | DIAGNOSTICS | Machine scanning probe heads (Machine Shop) | labombard | L | m | 06/09/08 | 07/09/08 | working Sylvia/Cauley |
| 13648 | INST/ELEC | Load new CPLD -DFOL PCB (Electronic Shop) | parkin | L | e | 06/12/08 | 06/23/08 | working, testing, Jonathan T, Supv:Parkin |
| 13652 | LOW HYBR | Anneal a 304L SS 2,050F for 4 hours. (Vacuum Shop) | zaks | L | v | 06/16/08 | 6/17/08 | working Rosati |
| 13654 | VAC. SYS. | Be window (Vacuum Shop) | toland | L | lv | 06/18/08 | 7/14/2008 | pending/Toland |
| 13655 | VAC. SYS. | clean windows (Vacuum Shop) | toland | L | lv | 06/18/08 | 7/28/2008 | pending |
| 13661 | POWER SYS. | ECDC with EF4 24V Interlock (Electrical Shop) | cochran | L | g | 06/20/08 | pending | |
| 13662 | POWER SYS. | ECDC with EF4 DC Circuit Breakers (Electrical Shop) | cochran | L | eg | 06/20/08 | pending | |
| 13668 | R.F. | IPA ELECTRICAL PWR (Electrical Shop) | binus | L | ep | 06/23/08 | pending:Chicarello/Telesmanick | |
| 13669 | DIAGNOSTICS | New detector electronics for VUV spectrometer detector electonics (Electronic Shop) | terry | L | e | 06/20/08 | 1/1/2009 | pending |
| 13672 | LOW HYBR | Vac Ion Connector Adjustment (Electronic Shop) | pmac | L | g | 06/24/08 | 7/11/08 | pending Mackay |
| 13673 | DIAGNOSTICS | Repair power supply (Electronic Shop) | labombard | L | e | 06/24/08 | 06/30/08 | working Jonathan T, Supv:Parkin. Parts on order |
| 13679 | DIAGNOSTICS | Custom backplanes for probe electronics (Electronic shop) | labombard | L | e | 06/26/08 | 07/15/08 | working Parkin |
| 13681 | MISC. BASE | Power for new UPS system (Utility Shop) | baker | L | e | 06/27/08 | 7/10/2008 | pending:Chicarello/Telesmanick |
| 13682 | MISC. BASE | Install new UPS system in NW16-233 (Utility Shop) | baker | L | eg | 06/27/08 | 8/1/08 | pending:Chicarello/Telesmanick |
| 13683 | MISC. BASE | Modify NW16-233 communications rack (Utility Shop) | baker | L | dgp | 06/27/08 | pending:Arsenault | |
| 13684 | MISC. BASE | Move old UPS system in NW16-233 (Utility Shop) | baker | L | egp | 06/27/08 | pending:Chicarello/Telesmanick | |
| 13686 | LOW HYBR | Elbow Arc Detector PCB wiring (Electronic Shop) | pmac | L | e | 06/30/08 | 7/3/08 | pending |
| 13688 | MISC. BASE | Raised floor supports (Welding Shop) | baker | L | dpw | 07/01/08 | 08/01/2008 | pending:Arsenault |
| 13691 | R.F. | FMIT Deck Hole Expansion (Machine Shop, Misc) | binus | L | mp | 07/02/08 | 7/25/108 | complete Shefton |
| 13692 | R.F. | Bracket Construction (Mechanical Group) | binus | L | dmp | 07/02/08 | 7-15-08 | pending |
| 13693 | VAC. SYS. | Drawings for the Vacuum Vessel Heaters (Mechanical Group) | burke | L | d | 07/02/08 | 07/14/08 | pending |
| 13694 | DNB | DNB cathode heater (Mechanical Group) | granetz | L | v | 07/07/08 | 07/11/08 | pending |
| 13695 | DNB | DNB arc source (Machine Shop) | granetz | L | m | 07/07/08 | 07/31/08 | working Sylvia |
| 13696 | DNB | Improve design of DNB cathode heater assembly (Mechanical Group, Machine Shop, Vacuum Shop) | granetz | L | dmv | 07/07/08 | 09/30/08 | pending |
| 13698 | MACHINE UPGRADE | Cut material to size for manufacturing alternator rotor bolt. (Machine Shop) | zaks | L | m | 07/08/08 | 7/25/108 | complete |
| 13700 | DIAGNOSTICS | reduce height of 4 MSE support plates (Machine Shop) | sscott | L | m | 07/08/08 | 7/25/108 | complete |
| 13702 | OPERATIONS | Replace Temporary Force Fiber with an improved installation (Electrical shop, Electronic Shop) | dekow | L | e | 07/09/08 | pending | |
| 13703 | ALTERNATOR | oak cribbing (Machine Shop) | rowell | M | dg | 07/09/08 | 7/18/08 | working Fitz |
| 13706 | LOW HYBR | RF Diode Cables (Electronic Shop) | djohnson | L | e | 07/14/08 | 7/21/08 | pending |
| 13707 | LOW HYBR | LH Waveguide Plating Anode (Machine Shop) | lienard | L | m | 07/15/08 | 07/18/08 | working Cauley |
| 13708 | LOW HYBR | LH Waveguide Base Plate Block (Machine Shop) | lienard | L | m | 07/15/08 | 07/18/08 | working danforth |
| 13709 | DIAGNOSTICS | Polarimeter - Detector Amplifier Layout (Electronic Shop) | murray | L | e | 07/15/08 | 7/22/08 | working Parkin |
| 13710 | LOW HYBR | Baking of copper plated parts (Vacuum Shop) | zaks | L | v | 07/15/08 | 7/25/108 | complete Rosati |
| 13711 | DIAGNOSTICS | Mini-conflat and Feedthrough (Machine Shop, Welding Shop) | kmarr | L | mw | 07/16/08 | 7/23/08 | working Iverson/Sylvia |
| 13713 | LOW HYBR | Wire EDM 7 waveguides from the diffusion brazed block. (Machine Shop) | zaks | L | m | 07/18/08 | 7/25/08 | working Cauley |
| 13714 | DIAGNOSTICS | Make test cable for cPCI-7452 (Electronic Shop) | labombard | L | e | 07/21/08 | 07/24/08 | pending |
| 13715 | DIAGNOSTICS | Poloidal CXRS Ferrule (Machine Shop) | rachmcd | L | m | 07/21/08 | 8/21 | pending |
| 13716 | DIAGNOSTICS | Shutter Tube Wire Cushion (Machine Shop) | rachmcd | L | m | 07/21/08 | 8/21 | pending |
| 13717 | DNB | Leak checking DNB anode flange (Vacuum Shop) | gung | L | v | 07/23/08 | 7/30/08 | pending |
| 13718 | LOW HYBR | New LH test stand (Machine Shop) | vieira | H | m | 07/23/08 | working/danforth | |
| 13719 | LOW HYBR | Waveguide Wedge Loads (Waterjet) | wallaceg | L | 07/23/08 | pending | ||
| 13720 | ALTERNATOR | Assembly Guide Bushings (Machine Shop) | rowell | H | m | 07/23/08 | 7/25/108 | complete/sylvia |
| 13721 | DNB | DNB target chamber | granetz | L | d | 07/25/08 | 08/08/08 | pending |
| Total Active Requests | Pending Requests | Working Requests | Complete Requests | ESG Requests |
| 54 | 30 | 19 | 5 | 0 |