The LDX vacuum chamber has been sucessfully leak checked and pumped down to <10-7 torr.

The vessel completed all acceptance tests with better than specification results. The vessel acheived the above pressure with no baking and only 1/30th of the final design pumping speed. Great job to the folks at Vacumm Technology Associates/DynaVac for their excellent and timely completion of this component of the LDX project!

Some views of the LDX vacuum chamber located within the PSFC Tara cell.

Webmaster: D. Garnier